1 Garage come office/Man Shed, had this built befor leaving New Zealand
2 Start of the water tanks shed
3 Plastic water tanks
4 Shed for water tanks
5 Drilling for water
6 The new property wall
7 Garage/Shed/Office
8 Shaded vege garden
9 Wall construction
10 Clearing the weeds from the pool
11 More clearing
12
13 Earth for the new roadway
14
15 Laying the new road
16 Vege garden
17 Start of corn field
18 Reinforceing material for the new house
19 The new DIY sand trap for the watering system
20 Swimming pool or fish pond
21 The first construction column being erected
22
23 Foundations
24 Retaining wall
25 concrete footing reinforcing - concrete is being poured now
26 new water filter system under extended shed - the whole system cost $4000 - and the ferrous oxide water is now clean enough for a permanent supply for showers/toilets/cooking etc
27 house and garage retaining wall completed
28 They seem to know what they are doing
29 close up of the construction technique - one of the main materials used in construction is eucalyptus trees - not bamboo (that is just used mostly for scaffolding)
30 the earliest fruiting mango tree
31 Waste water treatment tank
32 Dawn same as Sunset
33 Temporary quarters
34
35 reinforcing preparation for Bathroom/Toilet floor
36 truck arrives with thin rough cast concrete slabs ?? huh - I was told floor was to be poured
37 some steel framework in place
38 poured bathroom floor
39 slabs being placed 14/02/2019
40 3½ inches of concrete poured on slabs, the reinforceing is hooked and jiggled up into the wet mix
41 Irrigation for the corn
42 The support columns
43 The chipper/mulcher/shredder machine loaded onto my vehicle
44 chipper/mulcher/shredder machine - for making compost out of what ever I can for the vege gardens and fruit trees.(see attached) - cost me 27500 baht (NZD $ 1250) - machinery here is as expensive as NZ
45 Irrigation for corn nearly completed
46 they started the roof yesterday and say they will have finished it in a week We will wait and see 24/02/2018
47
48
49 Brown colored roofing sheets all made to length specification so there is no overlapping joins
50 row of papaya palms all growing successfully
51 most of the barge boards screwed on
52 roof will be completed in a couple of days 4/3/2018
53 block layers start
54 block layers start
55
56 Tempature was 40°C so he is dressed to keep the heat at bay
57
58
59 Boxing for the steps
60
61
62 Steps ready for concrete pouring
63
64
65
66
67 view of lounge and dining room combined - 516 square feet
68 front porch/patio - 686 square feet
69 - side porch/patio which will have small shower and toilet at far end
70 view through dining room to kitchen
71 - Jiamjit in her grand front doorway entrance
72 side of the house view from garage
73 Jiamjit's "imperial" flight of steps to the front of the house
74 drainage for the sceptic tank etc
75
76
77
78
79
80
81
82
83 gang plastering west wing wall
84 front doorway
85 - kitchen entrance way
86 Side view of house, the triangle bit to the right is looking into the pool showing the wall
87 Ceiling supports
88
89
90
91 Kitchen ready to be fitted out
92
93 One happy tile layer.
94 Floor tiles
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109 driveway going in - concrete tomorrow = most of these workers are women
110 kitchen patio being tiled
111 dining room windows are in as per Jimajit's instructions that got lost in her Thai with Thais translation
112 smoko break for tillers in the master bedroom
113 Lounge swinging external doors going in today
114 Lounge patio being completed with tiles and grouted - again women
115
116 the second lot of sweetcorn is now over 8 foot tall (2.5 metres) - the first stand gets harvested today - the third stand is in the front 19/04/2018
117
118
119 new driveway shots
120 new driveway shots
121 new driveway shots
122 The new color scheme
123
124 driveway from road entrance.
125 5 inch thick concrete - started today to finish gap with drainage channel on garage side for dealing with massive runoff from thunderstorms
126 how do you call that level ???
127 front steps nearly completed with tiles (graa breuung - tiles - singular and plural)
128 main bathroom
129 small bathroom
130 small bathroom
131 Jiamjit's Fort Knox bedroom doors
132 The recovered and refurnished furniture
133 3 hours of rain, what I did not expect in Thailand was the noise that a trillion frogs can make - especially the little finger nail sized buggers -
134 They come out when it rains - no jungle movie has ever portrayed that sound - it is deafening)
135 kitchen coming along. Oven is in. Electric Hob is in. Gas Hob is in..
136
137 Electrician today putting in Range hood. (Great Kitchen).
138 Water Tanks and Filtration plant shed beeing finnished off/